top of page

04 October 2021 On Channel 24, military journalists in the War Technique program made an interesting report about our isolation boxes for the safe transportation of soldiers with burn wounds. With the help of such capsules, patients can be transported both by land and by air.

05.06. 2021 . A fire tank and a 300 m3 water tower were put into operation at a furniture factory in Chernivtsi

IMG_3857.jpg

May 15, 2021 A silo for wood chips with a capacity of 300 m3 was put into operation at the Interles woodworking factory in Poltava.

IMG_3859.jpg

June 2021 A silo for storage of wood chips with a capacity of 200 m3 was put into operation at a furniture factory in Cherkasy.

Знімок екрана  о 14.34.13.png

June 2021. The silos for storage of pellets with a capacity of 1600 m3 were put into operation at the elevator of the Baryshevskaya Grain Company. city of Nizhyn

bottom of page